summaryrefslogtreecommitdiff
path: root/kernel
diff options
context:
space:
mode:
authorDaniel Bristot de Oliveira <bristot@redhat.com>2017-03-02 15:10:58 +0100
committerIngo Molnar <mingo@kernel.org>2017-03-16 09:37:38 +0100
commitdf8eac8cafce7d086be3bd5cf5a838fa37594dfb (patch)
tree43c74c1f15a452bccf9bf5cc469f9261d4d55d70 /kernel
parent5ac69d37784b237707a7b15d199cdb6c6fdb6780 (diff)
sched/deadline: Throttle a constrained deadline task activated after the deadline
During the activation, CBS checks if it can reuse the current task's runtime and period. If the deadline of the task is in the past, CBS cannot use the runtime, and so it replenishes the task. This rule works fine for implicit deadline tasks (deadline == period), and the CBS was designed for implicit deadline tasks. However, a task with constrained deadline (deadine < period) might be awakened after the deadline, but before the next period. In this case, replenishing the task would allow it to run for runtime / deadline. As in this case deadline < period, CBS enables a task to run for more than the runtime / period. In a very loaded system, this can cause a domino effect, making other tasks miss their deadlines. To avoid this problem, in the activation of a constrained deadline task after the deadline but before the next period, throttle the task and set the replenishing timer to the begin of the next period, unless it is boosted. Reproducer: --------------- %< --------------- int main (int argc, char **argv) { int ret; int flags = 0; unsigned long l = 0; struct timespec ts; struct sched_attr attr; memset(&attr, 0, sizeof(attr)); attr.size = sizeof(attr); attr.sched_policy = SCHED_DEADLINE; attr.sched_runtime = 2 * 1000 * 1000; /* 2 ms */ attr.sched_deadline = 2 * 1000 * 1000; /* 2 ms */ attr.sched_period = 2 * 1000 * 1000 * 1000; /* 2 s */ ts.tv_sec = 0; ts.tv_nsec = 2000 * 1000; /* 2 ms */ ret = sched_setattr(0, &attr, flags); if (ret < 0) { perror("sched_setattr"); exit(-1); } for(;;) { /* XXX: you may need to adjust the loop */ for (l = 0; l < 150000; l++); /* * The ideia is to go to sleep right before the deadline * and then wake up before the next period to receive * a new replenishment. */ nanosleep(&ts, NULL); } exit(0); } --------------- >% --------------- On my box, this reproducer uses almost 50% of the CPU time, which is obviously wrong for a task with 2/2000 reservation. Signed-off-by: Daniel Bristot de Oliveira <bristot@redhat.com> Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org> Cc: Juri Lelli <juri.lelli@arm.com> Cc: Linus Torvalds <torvalds@linux-foundation.org> Cc: Luca Abeni <luca.abeni@santannapisa.it> Cc: Mike Galbraith <efault@gmx.de> Cc: Peter Zijlstra <peterz@infradead.org> Cc: Romulo Silva de Oliveira <romulo.deoliveira@ufsc.br> Cc: Steven Rostedt <rostedt@goodmis.org> Cc: Thomas Gleixner <tglx@linutronix.de> Cc: Tommaso Cucinotta <tommaso.cucinotta@sssup.it> Link: http://lkml.kernel.org/r/edf58354e01db46bf42df8d2dd32418833f68c89.1488392936.git.bristot@redhat.com Signed-off-by: Ingo Molnar <mingo@kernel.org>
Diffstat (limited to 'kernel')
-rw-r--r--kernel/sched/deadline.c45
1 files changed, 45 insertions, 0 deletions
diff --git a/kernel/sched/deadline.c b/kernel/sched/deadline.c
index 445e2787bf80..736d8b9d9bab 100644
--- a/kernel/sched/deadline.c
+++ b/kernel/sched/deadline.c
@@ -695,6 +695,37 @@ void init_dl_task_timer(struct sched_dl_entity *dl_se)
timer->function = dl_task_timer;
}
+/*
+ * During the activation, CBS checks if it can reuse the current task's
+ * runtime and period. If the deadline of the task is in the past, CBS
+ * cannot use the runtime, and so it replenishes the task. This rule
+ * works fine for implicit deadline tasks (deadline == period), and the
+ * CBS was designed for implicit deadline tasks. However, a task with
+ * constrained deadline (deadine < period) might be awakened after the
+ * deadline, but before the next period. In this case, replenishing the
+ * task would allow it to run for runtime / deadline. As in this case
+ * deadline < period, CBS enables a task to run for more than the
+ * runtime / period. In a very loaded system, this can cause a domino
+ * effect, making other tasks miss their deadlines.
+ *
+ * To avoid this problem, in the activation of a constrained deadline
+ * task after the deadline but before the next period, throttle the
+ * task and set the replenishing timer to the begin of the next period,
+ * unless it is boosted.
+ */
+static inline void dl_check_constrained_dl(struct sched_dl_entity *dl_se)
+{
+ struct task_struct *p = dl_task_of(dl_se);
+ struct rq *rq = rq_of_dl_rq(dl_rq_of_se(dl_se));
+
+ if (dl_time_before(dl_se->deadline, rq_clock(rq)) &&
+ dl_time_before(rq_clock(rq), dl_next_period(dl_se))) {
+ if (unlikely(dl_se->dl_boosted || !start_dl_timer(p)))
+ return;
+ dl_se->dl_throttled = 1;
+ }
+}
+
static
int dl_runtime_exceeded(struct sched_dl_entity *dl_se)
{
@@ -928,6 +959,11 @@ static void dequeue_dl_entity(struct sched_dl_entity *dl_se)
__dequeue_dl_entity(dl_se);
}
+static inline bool dl_is_constrained(struct sched_dl_entity *dl_se)
+{
+ return dl_se->dl_deadline < dl_se->dl_period;
+}
+
static void enqueue_task_dl(struct rq *rq, struct task_struct *p, int flags)
{
struct task_struct *pi_task = rt_mutex_get_top_task(p);
@@ -954,6 +990,15 @@ static void enqueue_task_dl(struct rq *rq, struct task_struct *p, int flags)
}
/*
+ * Check if a constrained deadline task was activated
+ * after the deadline but before the next period.
+ * If that is the case, the task will be throttled and
+ * the replenishment timer will be set to the next period.
+ */
+ if (!p->dl.dl_throttled && dl_is_constrained(&p->dl))
+ dl_check_constrained_dl(&p->dl);
+
+ /*
* If p is throttled, we do nothing. In fact, if it exhausted
* its budget it needs a replenishment and, since it now is on
* its rq, the bandwidth timer callback (which clearly has not