summaryrefslogtreecommitdiff
path: root/kernel/ksysfs.c
diff options
context:
space:
mode:
authorLuca Abeni <luca.abeni@unitn.it>2015-10-16 10:06:21 +0200
committerIngo Molnar <mingo@kernel.org>2015-10-20 10:13:36 +0200
commit5aa5050787f449e7eaef2c5ec93c7b357aa7dcdc (patch)
tree415d7714d29be706d5713a6a2447500eba8d9c00 /kernel/ksysfs.c
parent0baabb385eb4bce699ddab0db015112be6cf1e6a (diff)
sched/deadline: Fix migration of SCHED_DEADLINE tasks
Commit: 9d5142624256 ("sched/deadline: Reduce rq lock contention by eliminating locking of non-feasible target") broke select_task_rq_dl() and find_lock_later_rq(), because it introduced a comparison between the local task's deadline and dl.earliest_dl.curr of the remote queue. However, if the remote runqueue does not contain any SCHED_DEADLINE task its earliest_dl.curr is 0 (always smaller than the deadline of the local task) and the remote runqueue is not selected for pushing. As a result, if an application creates multiple SCHED_DEADLINE threads, they will never be pushed to runqueues that do not already contain SCHED_DEADLINE tasks. This patch fixes the issue by checking if dl.dl_nr_running == 0. Signed-off-by: Luca Abeni <luca.abeni@unitn.it> Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org> Cc: Juri Lelli <juri.lelli@arm.com> Cc: Linus Torvalds <torvalds@linux-foundation.org> Cc: Mike Galbraith <efault@gmx.de> Cc: Peter Zijlstra <peterz@infradead.org> Cc: Thomas Gleixner <tglx@linutronix.de> Cc: Wanpeng Li <wanpeng.li@linux.intel.com> Fixes: 9d5142624256 ("sched/deadline: Reduce rq lock contention by eliminating locking of non-feasible target") Link: http://lkml.kernel.org/r/1444982781-15608-1-git-send-email-luca.abeni@unitn.it Signed-off-by: Ingo Molnar <mingo@kernel.org>
Diffstat (limited to 'kernel/ksysfs.c')
0 files changed, 0 insertions, 0 deletions