diff options
author | Petr Oros <poros@redhat.com> | 2019-06-19 14:29:42 +0200 |
---|---|---|
committer | David S. Miller <davem@davemloft.net> | 2019-06-22 09:40:50 -0400 |
commit | 2e5db6eb3c23e5dc8171eb8f6af7a97ef9fcf3a9 (patch) | |
tree | d8de524a777ea6d398fb3380dcf631f1d6339f62 /Documentation/phy | |
parent | c356dc4b540edd6c02b409dd8cf3208ba2804c38 (diff) |
be2net: fix link failure after ethtool offline test
Certain cards in conjunction with certain switches need a little more
time for link setup that results in ethtool link test failure after
offline test. Patch adds a loop that waits for a link setup finish.
Changes in v2:
- added fixes header
Fixes: 4276e47e2d1c ("be2net: Add link test to list of ethtool self tests.")
Signed-off-by: Petr Oros <poros@redhat.com>
Reviewed-by: Ivan Vecera <ivecera@redhat.com>
Signed-off-by: David S. Miller <davem@davemloft.net>
Diffstat (limited to 'Documentation/phy')
0 files changed, 0 insertions, 0 deletions